It took a couple of years, but...

Custom XJ builds, restorations, major modifications or just a topic dedicted to your own bike. Look here for long term cool projects.
Post Reply
User avatar
buckinghamjf68
One of the Regulars
One of the Regulars
Posts: 147
Joined: Wed Jul 30, 2014 12:51 pm

As the title says, it took a couple of years to get the bike from a stripped frame to the point I'm ready to turn it over. The video is the two years rebuild in just under two minutes

Image

The tank décor is mock-up only as I am getting them made. The tank and the seat on the video pic, is an old picture which has now been changed to the picture you see below.

Upgrades were the front and rear of an FZR600

Progress wise, I have gone back to front, every screw, bolt, and fastener has been torqued to specification, have applied either thread lock or copper slip where the manual has specified, the liquids are in, and everything does what its supposed to be doing. I have mocked up the tank designs, and the seat cover arrived this morning.

The final phase will be to turn her over, and work out why she wont start... I have said it before, but thank you, you have built an incredible library of information, which I frequently use and recommend to everyone I find with an XJ.

My Project: "Just Add Fuel1"

[Video][/Video]

This topic has 5 replies

You must be a registered member and logged in to view the replies in this topic.


Register Login
 
Post Reply